Copyright © 2011-24 Helical Pile World, LLC.  All Rights Reserved.

Home | Engineers | Manufacturers | Installation Contractors | News | Technical Advisors | Contact Us

Links | Advertise | Terms of Use | Privacy Policy

Helical Pile World eNews Subscription Home Helical Pile World - The Global Information Source For The Helical Pier Industry


Helical Pile World Advertising CTL Thompson Testing

Straight Line Construction was called out to investigate (3) separate multi-unit apartment buildings at The Shores at Lakeview in Pueblo, CO.  Several units showed large drywall cracks and sloping floors. The 120’ long buildings measured differential settlement of over 3.5 inches. Working with local Engineering firm Printz Engineering Services (PES), a design to install 57 helical piles on 2 of the buildings was created. Straight Line Construction installed (57) total, 2 7/8” Ram Jack helical piles with a single 8” helical plate to an average 23’ depth. Once the piles and brackets were installed, hydraulic jacks were connected to manifolds and each structure was lifted to maximum practical recovery. Straight Line Construction also used poly foam injection to recover the interior slab floors to near original elevation. The installation was completed in two phases minimizing the disruption to residents in the area with an additional phase on the 3rd building forthcoming.

Straight Line Construction Installs (57) Helical Piles for Two Multi-Unit Apartment Buildings at the Shores at Lakeview in Pueblo, CO

February 2024

by Patrick Harmsen

Ram Jack Arizona (Phoenix) - (480) 941-3448

Ram Jack Arizona (Tucson) - (520) 229-1474

Ram Jack Colorado - (303) 716-7437

Ram Jack New Mexico - (505) 771-8890

Straight Line Construction Co. - (719) 545-9942