Challenging Boardwalk Project with Varying Above Grade Elevations and Cross Bracing Support


April, 2011

Extreme Technologys

4501 Industrial Access Road

Douglasville, GA 30134

770-942-6262

www.extremetechnologys.com

Project Overview

This challenging boardwalk project through a wetland region in Morrow, GA was originally specified for a mixture of square bar and round shaft helical piles with varying cross bracing solutions for the different piles.  The reason for the variety of piles was due to elevation changes and the need for above grade lateral support with average elevations of approximately 3 feet with the highest elevation being 6 feet.  The project was greatly simplified by means of a new design that called for all round shaft helical piles and a single cross bracing system.  The project timeline was significantly dotted with numerous weather delays and high water.

The amount of standing water at the wetland job site varied significantly with periods of heavy rain which in turn caused challenges for equipment operators and laborers alike.

Elevation changes along the entire length of the boardwalk presented both design and construction challenges.  An adjustable cross bracing system from Magnum Piering provided the necessary flexibility for consistent bracing at the various elevations.

The width of the boardwalk is 8 feet, and the unique design consists of 2x4’s turned on their 2” edge and compressed together similar to a laminate.