Project Purposed:

A homeowner contacted us to investigate cracks in their building structure and to repair their two-story addition. Upon geotechnical inspection, significant vertical cracks ranging from 25mm to 50mm were discovered running from the ground floor wall throughout the second floor and roof walls. Additionally, the building exhibited foundation settlement with a noticeable tilt towards one end. 

To address these concerns, we recommended a combined solution of helical piles with underpinning brackets to halt further settlement and potentially jack up the addition, which would reduce the tilt and insure stability. 

To address the tilt and restore the building's level plane, we proposed installing (5) strategically-placed anchor bolts. These bolts enabled a controlled pulling action to bring the existing and extended sections closer together and correct the position of the entire addition.

RIYE Engineering Installs (13) Helical Pulldown Piles to Underpin an Existing House & Support a New Addition in Selangor, Malaysia

July, 2024

RIYE Engineering - Helical Pile Asia

RIYE ENGINEERING Sdn Bhd

1-10-07 Aurora Sovo,

Plaza Bukit Jalil

Aurora Place

No.1 Persiaran Jalil 1,

57000 Kuala Lumpur, Malaysia

Telephone: +6017-3030783

Website: www.helicalpile.asia

Email: info@helicalpile.asia


  • Structures: Two-storey reinforced concrete structures
  • Soil Type: Unknown
  • No. of Piles: (13)
  • Pile Capacities: Helical pulldown pile H74, pile working capacity 130KN x 8 points @ 12m-15m, 80kN x 5 points @ 6m-9m.
  • Helix Bearing Plates: (2) 254mm, 305mm
  • Underpinning Brackets: Steel bracket capacity (2) 50kN & 130kN
  • Ground Beam Re-strengthening: Steel plates
  • Building Displacement Monitoring: Install (4) nos tell tales
  • Installation Timeline: Excavation (4) days; Working piles (4) days; Underpinning & jacking works (20) days