174 Deep Foundation Helical Piles Installed for 40,000 Square Foot
Jupiter Island Club Maintenance Facility
Summer 2012
![](wpimages/wp4d1b5431_06.png)
Brownie Companies
Geotechnical Construction Division
175 Boyd Road
Fort Pierce, FL 34945
772-460-5660
![](wpimages/wp8c7533a5_06.png)
![](wpimages/wpb28ecdd0_05_06.jpg)
Project Overview
The Jupiter Island Club needed a new 40,000 square foot maintenance building. The site presented a deep foundation challenge as there are (2) layers of soft, wet soils - one at 4-8 feet; the other one at 12-14 feet. The foundation design engineer determined that suitable being strata existed between 16-18 feet, so 20 foot helical piles with some 20” and some 24” helix bearing plates were specified, and load tests were successful to verify the required (25) ton working capacity.