Copyright © 2011-24 Helical Pile World, LLC. All Rights Reserved.
Home | Engineers | Manufacturers | Installation Contractors | News | Technical Advisors | Contact Us
30 Large Diameter 80 Ton Helical Piles Installed to Support Con Edison of New York Substation F at Brooklyn Navy Yard Next to Famous Steiner Studios
Scobbo Foundation Systems
Long Island, NY Piscataway, NJ
(516) 944-7154 (516) 944-PIER
IDEAL Group helical piles being unloaded at job site adjacent to the famous Steiner Studios complex.
Con Edison Substation F platform site preparation.
One 80 ton ultimate capacity compression load test was successfully completed. The 30 helical piles were installed in 3 days.
8.625” diameter helical piles in 20 ft. sections being installed to an average depth of 40 ft.
Project Overview
Scobbo Foundation Systems was contracted to install 30 new construction helical piles to support the new Con Edison Substation F located in the Brooklyn Navy Yard adjacent to the well known Steiner Studios. Caissons, drilled piers and H piles were considered, but due to close proximity to existing structures, vibration concerns were a significant factor. For this reason and for overall project cost concerns, helical piles were selected.